Monday, July 23, 2012
Springer Repair Part 2
So on to fixing the front legs
basically its the same process as the rear legs its just getting the legs line up properly, measured out, and set in the jig properly
Setting up the jig here for the new chock that will hold the spring rods
cleaning out the grime on the rocker holes
then onto the slug parts all fitted and welded up into the lower leg portion
sitting pretty in the jig all lined up nice
after the first 2 passes of welding and the first pass with the flap disc
filler pass with silicone bronze
smoothing and finishing
all ready to be assembled
all back together
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment